Description: Re-roughcasting to 13 properties in Dufftown and Keith Morayshire
Work Content: Over–rendering using Alumsac polymer render, renewal of downpipes, painting and ancillary works.
Work completed in 2 weeks, exceptional satisfaction rating from tenants:
‘What can I say everything was perfect’ – Diana Robinson 39 Chapel St Keith.
‘Job carried out with minimum disruption’ – Patricia Porter 15 Baehead Terrace Dufftown.
‘The work was carried out in a professional manner’ – Mr & Mrs Goldthorp 3 Braehead Terrace Dufftown.